|

|
 |
Bursa Cement Factory Co.,Inc. (Bursa Cimento Fabrikasi
A.S.) was established with 30.000.000 TL capital as an
incorporated company on 14 July 1966 in Kestel/Bursa. It
is still keeping on the characteristic of being %100
open to the public.
The first production line was put into operation on 30.01.1969 with
a 230.000 tons/year clinker production capacity and
250.000 tons/year cement grinding capacity. In 1976, by
putting into operation the second production line, the
clinker production capacity was increased to 480.000
tons/year and cement grinding capacity was 520.000
tons/year. With the addition of the third cement mill,
the cement grinding capacity was reached to 1.000.000
tons/year. In 1989, it was decided to increase of the
clinker production by evaluating increasing demand, precalcination of the second production line was made
and as a result clinker production capacity was reached
840.000 tons/year.
In 1992 by the modernization which
was made in cement mills, cement grinding capacity was
increased 1.200.000 tons/year and by the Roller Pres
Unit which was taken into operation in 1993, total
cement grinding capacity of Bursa Cement Factory was
increased 1.750.000 tons/year. In 1996, precalcination
of the first line was made and clinker production
capacity was increased to 1.350.000 tons/year and cement
grinding capacity was reached 1.850.000 tons/year.
Investments for the fourth cement mill with a capacity
175 t/h and a cement silo with 10.000 tons capacity were
completed by 25th May 1999.
Today, 1.400.000 tons/year clinker production capacity and 2.850.000 tons/year
cement grinding capacity and 31.000 tons cement stock
capacity are available.
The Bursa Cement Factory operates in the Marmara region which is
the most developed region of Turkey.
Approximately 30%
of cement production in Turkey are realized in Marmara
region. Bursa Cement Factory provides roughly 13% of
cement consumption in Marmara region and 4% of cement
consumption in Turkey.
In order to use the fly ash which is obtained from the
electrostatic precipitator of coal burning power plants
as an additive to cement in compliance with the
standards, fly ash stock silo and transport system were
put into operation by Bursa Cement Factory.
First system
was installed in October 2001; 800 m3 silo capacity and
50 tons per hour capacity for feeding the second and
third cements mills. The other system was installed
1.500 m3 silo capacity and 80 tons per hour capacity for
feeding the fourth cement mill.
In order to supply fly ash which is used as an additive in the
cement and concrete from the electrostatic precipitator,
ARES and Tunckul Fly Ash Plants were joined to the Bursa
Cement Company.
In order to meet cement demand in Kutahya region
locally, “Kutahya Cement Mixing and Packing Plant” was
taken into operation in Kutahya with a capacity of 80
tons per hour and with IBAU Mixing technology in
November 2005.
In Kutahya Cement Mixing and Packing
Plant, the cement which is produced in Bursa Cement
Factory and fly ash that is obtained from thermal power
plants (Seyitomer, Tuncbilek, Orhaneli) are mixed
together for producing blended cement.
|
|